Friday, 25 May 2012

Church Road bridge to be strengthened

Church Road bridge is due to be strengthened or replaced as needed in 2013/14. The estimated cost is £435,000.

Thursday, 24 May 2012

Travelling to the BRI or the Children's hospital?

There are currently major changes to the drop-off area at the BRI and BRHC due to the development work going on at the BRI. More information about the changed arrangements, which are due to last until 22 June, can be found on the Univeristy Hospitals Bristol website.

Speed limit cut in Old Glos Road


Residents are delighted that the new speed limit signs have gone in on Old Glos Road and Perrinpit Road.

Wednesday, 23 May 2012

Wessex Water installing holding tank

Wessex Water are making progress with installing the holding tank to the south of the Badminton Road viaduct, which the planning committee approved earlier this year. The tank is intended to stop sewage flooding in houses in Vicarage Road. It is not related to Barratt Homes' proposals for Woodlands Farm.

Tuesday, 22 May 2012

Launch of the Green Dog Walkers scheme

Following a proposal to South Glos Council by Claire Young, the scheme which cut dog fouling problems in Falkirk by 50% is due to be launched in Frampton Cotterell and Coalpit Heath. The launch is at 7.30pm on Monday 28th May in the Brockeridge Centre.

Dave Hockey explained, “When Pat and I carried out a survey of all local residents before the elections last year, 1 in 3 residents complained about the growing problem of dog fouling. It was clear that something needed to be done to encourage responsible dog ownership in our area. The Parish Council agreed to back the introduction of the Green Dog Walkers Scheme which had been pioneered in Falkirk and cut dog fouling by half”.

Local resident Kirstie Bidwell attached a map to her survey response with local roads highlighted. It was headed ‘These are the locations where I see dog mess on a daily basis. With 2 young children, this is the most annoying thing I have to deal with EVERY DAY’.

Claire said, “I am delighted that the scheme is to be piloted in Frampton Cotterell Parish. I hope the trial is successful and it results in a significant cut in dog fouling problems on local pavements, footpaths, parks and sports pitches. If it is, I am sure that other Towns and Parishes across South Gloucestershire will be interested in launching the scheme in their areas”.

Stover Road to close for 2 nights

Stover road will be closed for resurfacing on the nights of 24th and 25th May between Badminton Road and the Yate Road Roundabout. The weight limit on Station Road will be suspended during the closure.

Monday, 21 May 2012

Reducing sewage spills in the Frome Valley

After more than 15 years campaigning, Dave Hockey is delighted that Wessex Water are at last installing a very large screening system which hopefully will  eliminate the solid sewage waste discharged into the River Frome following heavy rainfall.


The major scheme at Cog Mill, Iron Acton is well under way. Wessex Water state that work should be completed on site by August when the Frome Valley Walkway will be reinstated along the riverside.


Dave Hockey said, “After years of suffering from sanitary towels, condoms and other sewage waste left stranded on the Glebe Land and along the banks of the River Frome after floodwaters have subsided, I hope that this second scheme is more effective than the first – we’ll watch the results with great interest.”