There are expected to be weekend road closures (between 8pm Fridays and 6am Mondays) of the A46 between the Cold Ashton Roundabout and the A46/A4 London Road junction, Bath between 11 January and 14 March 2013. The northbound entry slip road at the London Road junction will also be closed, along with the layby adjacent to the A46 southbound to the south of its junction with Blacksmith Lane, and there will be a 40mph speed limit in operation between the entrance to Four Winds Farm and the London Road junction.
No comments:
Post a Comment