Local news for the central rural area of South Gloucestershire, covering the Charfield, Frampton Cotterell, Ladden Brook and Westerleigh wards.
Thursday 26 January 2017
Temporary swimming pool at Yate for 6 months
Because of essential maintenance work at Yate Leisure Centre, both swimming pools will be closed from the end of March until the Autumn. Public swimming WILL still be available using a temporary swimming pool.
The pool and plant equipment requires essential maintenance work for it to remain in operation. The pool pipework and plant will be replaced with new environmentally friendly equipment.
Our Yate colleagues contacted Circadian Trust for more details about the temporary pool, and they told them: "It will be 18m in length X 10m in width X 1m deep. The frame will be constructed mainly of wood, then lined with a sand based and a pool liner. The whole structure will be secured in a marquee in the rear of the Kennedy Way car park. Customers will access the pool from the corridor of the main building (customers will not be outside, there will be an enclosed walk-way). The admission costs and opening times will be the same as normal and a specific pool timetable will be created for this period. All swimming lessons will continue and lesson days and times will remain UNCHANGED."
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment