Showing posts with label swimming. Show all posts
Showing posts with label swimming. Show all posts

Thursday, 14 September 2017

Yate Swimming Pool to reopen at end of October

Yate Leisure Centre have announced:

"We are pleased to announce to all Active Customers, that both of our Swimming Pools will be opening again at the end of October following major redevelopment works. This is a little later than originally envisaged."

"Both pools will be re-filled with water during early October. This is to enable the building contractors to monitor and test the integrity of the new pools. The water will then be gradually heated prior to opening for general use."

"We are really excited that we are nearing completion and the reopening date. We would like to take this opportunity to thank you for your patience and continual support."

Thursday, 26 January 2017

Temporary swimming pool at Yate for 6 months


Because of essential maintenance work at Yate Leisure Centre, both swimming pools will be closed from the end of March until the Autumn. Public swimming WILL still be available using a temporary swimming pool.

The pool and plant equipment requires essential maintenance work for it to remain in operation. The pool pipework and plant will be replaced with new environmentally friendly equipment.

Our Yate colleagues contacted Circadian Trust for more details about the temporary pool, and they told them: "It will be 18m in length X 10m in width X 1m deep. The frame will be constructed mainly of wood, then lined with a sand based and a pool liner. The whole structure will be secured in a marquee in the rear of the Kennedy Way car park. Customers will access the pool from the corridor of the main building (customers will not be outside, there will be an enclosed walk-way). The admission costs and opening times will be the same as normal and a specific pool timetable will be created for this period. All swimming lessons will continue and lesson days and times will remain UNCHANGED."